Why?
Installation is the highest risk
The plan
The plan & design are challenged
Every detail in design and every planned schedule and sequence are tested the moment installation starts — on site, not on paper.
Reality
Surprises and disruptions are a given
Mistakes, delays and supply-chain problems arrive unannounced, and each one lands on the installation team.
The cost
Every delay is critical
One idle day for an installation team costs thousands — in wages alone.
Why Rakto
Decision making at a single click
- Single source · 01
Design-execution continuity
Execution runs on the design model itself — nothing is re-entered or translated, so the site builds exactly what engineering intended.
- Early signals · 02
A step ahead of risk
Exceptions surface as they emerge — a late delivery, a missing part, an out-of-sequence install — with an accurate mitigation already in view.
- Traceability · 03
3D model based
Every part, task and decision lives on the 3D model. Click a piece to see its status, history and dependencies — no reconstructing data from documents.
- Execution · 04
Powerful forecasting
Live planning and forecasting with zero overhead — no extra paperwork, forms or inputs — transforming reactive teams to proactive.
- Sequencing · 05
Tailored to segmented installation
Workflows and sequencing purpose-built for segmented installation — steel structures, racking and intralogistics — matching industry standards.
- Actionability · 06
End-to-end visibility
One live view across every site, supplier and subcontractor: what's shipped, on site, installed and at risk — exceptions flagged instantly.
Product
See it in action
Get in touch